Table of Contents Table of Contents
Previous Page  131 / 154 Next Page
Information
Show Menu
Previous Page 131 / 154 Next Page
Page Background

130

Engineering Fee Description

Current Fee

Adopted Fee Change

Floodplain Development Permit

Elevation Certificate

$150

Map Revision (CLOMR/LOMR)

$1,000

Riparian Buffer Development (No

practical alternatives) Submittal

2 Reviews

$250

3

rd

Review and thereafter

$75

Stormwater Plan Review Fee (Includes 3

review or if submitted concurrent with

Site Plan includes first 4 reviews.)

$550 + $55/acre per disturbed acre

Re-Submittal Stormwater Plan Review

Fee (4th submittal and each thereafter.)

$350

Project Close-Out Fees (Paid upon

Project Completion)

Record Drawing Review - Includes 2

Reviews Note: Morrisville Only, See

Town of Cary for fees related to utility

As-Builts

$250

Re-submittal Record Drawing - 3rd

Review and each Thereafter

$150

Stormwater As-Builts - includes 2

reviews

$250 per

BMP

SCM

Stormwater As-Builts - 3rd Review and

each Thereafter

$125

Miscellaneous Fees

Administrative Appeal (EDCM)

$610

Alternative Standard (EDCM) - Request

for alternative standard

$150 per request standard

Bulletin Drawing Review

- per review

(includes 2 reviews)

$150

Interpretation (EDCM)

$205

Retaining Wall/Other Structures

Submittal

1st Review

$150