Operating conditions
§
The Safety Integrity Level achieved during design and
engineering is as per the required target SIL
§
The on-going safety performance – i.e., SIL may be
affected by the operating conditions
§
Periodic maintenance and proof testing is required to be
implemented so as to ensure the continued and
demonstrable integrity of each SIF post commissioning.
§
The IEC 61511 safety lifecycle approach requires, that
appropriate competency is applied
§
How can an operator who is challenged with maintaining
process safety and maintaining aggressive production
targets actually implement and monitor a verification and
proof testing program?