Operating conditions

§

The Safety Integrity Level achieved during design and

engineering is as per the required target SIL

§

The on-going safety performance – i.e., SIL may be

affected by the operating conditions

§

Periodic maintenance and proof testing is required to be

implemented so as to ensure the continued and

demonstrable integrity of each SIF post commissioning.

§

The IEC 61511 safety lifecycle approach requires, that

appropriate competency is applied

§

How can an operator who is challenged with maintaining

process safety and maintaining aggressive production

targets actually implement and monitor a verification and

proof testing program?