![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0432.jpg)
Proof Test Strategy
Partial Testing
•
Partial testing refers to a test that is capable of revealing certain failure
modes.
•
By carrying out a series of partial tests it may be possible to reveal all failure
modes.
•
Partial tests can be carried out at different frequencies.
An example of partial testing would be the testing of an actuated valve.
–
Partial test 1:
Witness valve transition from operation position to the safe state in a
smooth manner whilst the plant is shut down.
–
Partial test 2:
Flow scan of the valve and compare performance results against results
taken when new.
–
Partial test 3:
Leak test of valve, requires valve to be removed from service.