| Slide 15
Time to Evolve? – 3
Strategies 1 & 2
§
Strategy 1: Maintain to End of Life
§
Good basis of design available
§
Not seeing the KPI’s for failures/increasing costs for the systems
as stands
§
Prepared to maintain for life of plant with established resources
§
Strategy 2: Modify and Evolve to Meet New Operating Requirements
§
Good basis of design available
§
KPI’s may or may not be providing evidence of failures/cost
§
Plan for evolution for life time of plant – change in operating
strategy