Hydrant Meter Rental Units- Training Manual

This is an image of what the completed assembly should look like.

Once it is finished you should test it to be certain that is ready for use

Once the assembly is tested by the FUS (Field Utility Specialist) , the meter and backflow information is entered into The Compliance Engine (TCE) by the Administrative Technician (AT).

17

Made with FlippingBook Online newsletter