Hydrant Meter Rental Units- Training Manual
Be sure that the hydrant meter assembly is ready for use by testing it.
• Once the assembly is tested by the FUS (Field Utility Specialist) , the meter and backflow information is entered into The Compliance Engine (TCE) by the Administrative Technician (AT). • A work order is created for the hydrant rental unit and submitted to the Office UT. • The Office UT will write-off the inventory in the Hydrant Program and all associated parts to the rental unit.
9
Made with FlippingBook Online newsletter