Total Site Solutions Mobilisation Guide
do not s
1200x1200Noticeboard
h&cHooks 1800affl
Open plan canteen
UPVC T&T UPVC T&T
by steel shroud.
Water Inlet/ Waste Outlet through wall protected
Worktop@900mmaffl
h&cHooks 1800affl
1200x1200Noticeboard
HLBU1000
300mm Link
1200x1200 Noticeboard
h&c Hooks 1800 affl
Worktop @ 900mm affl DLBU1000 White goods By Others
UPVC T&T UPVC T&T
UPVC T&T UPVC T&T
Open plan canteen
by steel shroud.
Water Inlet/ Waste Outlet through wall protected
h&c Hooks 1800 affl
1200x1200 Noticeboard
HLBU1000
300mm Link
Drying room
Water Inlet/WasteOutlet throughwallprotected by steel shroud.
Waste outlet/ Water Inlet through wall protected by Steel Shroud
HL 3
HL 3
Female WC
Shroud
Shroud
Male WC
wdp
IB
IB
IB
IB
m
Waste outlet/ Water Inlet through wall
Waste outlet/ Water Inlet through wall
m
protected by Steel
protected by Steel
Lavatories
Uni-Sex Shower
m
m
m
m
m
m
m
m
2X5DL IB
762
762 2X5DL RC
762 2X5DL IB
A separate toilet and shower facility is provided in addition to the lavatories housed within the main office cabins.
Rev:
Client:
. .
Project: Anti Va 21-50 P
Title:
Plan lay
Date:
Dwg N 03.04.1 03.489
34
Total Site Solutions | www.murphygroup.co.uk
Made with FlippingBook - Online catalogs