Total Site Solutions Mobilisation Guide
WEEKS
-26 -25 -24 -23 -22 -21 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10
ELECTRICAL SYSTEMS
Mains power supplies In some circumstances it is necessary to provide mains electricity to site. This will be decided in the planning stage and will be
Generators Generator needs will be assessed based on the size of the site and personnel numbers. A range of options are available. The list below shows the most commonly used, and other options are shown on the right.
-15 -14 -13 -12 -11 -10
dependent on a number of factors including geographical location and site accessibility. Specifications are developed to meet anticipated energy usage and support the number of staff on site.
-12 -11 -10
Small — 0-10 S100 — 30 kVa Medium — 11-20
-9 -8 -7
-9 -8 -7 -6 -5 -4 -3 -2 -1 0 -9 -8 -7 -6 -5 -4 -3 -2 -1 0
-9 -8 -7 -6 -5 -4 -3 -2 -1 0
T100 — 45 kVa Large — 21-50 U100 — 60 kVa Modular — 50+ V100 — 80 kVa / V120 — 80 kVa
-7 -6 -5 -4 -3 -2 -1 0
-6 -5 -4 -3 -2 -1 0
SITE GO
-12 -11 -10
-8 -7 -6 -5 -4 -3 -2 -1 0
-6
-5 -4 -3 -2 -1 0
-5
-4 -3 -2 -1 0
DEMOB COMPLETE