EQUIPMENT INSTALLATION GUIDE

- The ABS Beverage installer will schedule and perform a crew training session. - ABS Beverage installer attaches the flavor line up sheet to the front of the unit, for use by the POS vendor when programming the system. 6. Make all final water and syrup connection on all dispensing towers. 7. Start-up and calibrate beverage system and dispensing towers. 8. Supply owner operator flavor map information to program POS for Automated Beverage System (ABS). Plumbing Contractor 1. Connect building water supply to rear room equipment package. 2. Route and connect drain line for beverage stations, including ABS and SSBB. 3. If required by local codes, supply and install backflow preventers to center island equipment, the presenter’s booth equipment and the bun steamer, prior to final hook up by beverage installer.

Electrical Contractor 1. Final electrical connection to rear equipment package. 2. Complete final hook up of electrical power to SSBB and ABS stations.

Refrigeration Contractor 1. Pull pre-charged refrigeration lines to remote condenser and ice machine communication wiring per manufacturer specifications. Do not connect the lines. Connection will be made by beverage installer. Owner Operator 1. Ensure that CO2 and syrup are in the store at completion of the drink system installation so that the system can be tested. 2. If final connections were not possible during installation week, arrange for start-up of beverage system FASC. 3. Program POS system per flavor map provided by beverage installer for ABS.

Ice Machine

General Contractor 1. All roof penetrations need to be sealed.

KES Installer 1. Notify the Beverage installer when they will be needed, based on site conditions upon arrival. 2. Uncrate and move ice bin into position and level. 3. Set and attach icemaker on bin. 4. Direct electrical contractor on wiring to the unit. 5. Direct plumbing contractor on installing drains. 6. Direct refrigeration contractor to pull pre-charged refrigeration lines to remote condenser. 7. If ice machine is being connected to the Mac condenser and requires a head pressure control kit, locate and retain kit for installation by Ice FASA. 8. Direct ice machine Beverage installer to connect refrigeration lines (and head pressure control kit if appropriate for ice machine being connected to Mac condenser) to remote condenser. 9. Coordinate and arrange start-up if final connections are possible during installation. (If not possible, provide the FASA contact information to the owner operator.) Refrigeration Contractor 1. Pull pre-charged refrigeration lines to remote condenser and ice machine communication wiring per manufacture specifications. Do not connect the lines. Connection will be made by beverage installer.