New Restaurant Guide

EQUIPMENT INSTALLATION GUIDE

Energy Management System

General Contractor 1. Verify all RTU’s are in place, high and low voltage wire runs for EMS system.

2. Lighting circuits MUST be completed for kitchen, dining, building exterior lights, signs and lot poles. All load wiring for the following must be ran through a junction box above Panel LP1. Emergency lights will not be controlled by EMS system. 3. Notify EMS Installer if electrical schedule or HVAC plan has been altered from the provided Electrical & Mechanical drawing plans. 4. Permanent power needs to be connected and all buy out startups need to be completed before scheduling EMS installer. HVAC Contractor 1. Install all HVAC systems per manufacture instructions. 2. Install humidity sensors as called out in the building HVAC plans. 3. Make final connections with thermostat wire to RTU controls. RTU MUST be placed into thermostatic control for EMS Installer. EMS Installer 1. Mount Lighting Control Panel above ceiling above Panel LP1. 2. Install Control Box above ceiling near Main Distribution Panel. 3. Wire the kitchen, dining, building exterior lights, signs and lot pole circuits from EC installed junction box to control via EMS Lighting control. Emergency lights will not be controlled by EMS System. 4. Mount and make final connection to EMS thermostat per HVAC Duct Plan. 5. Mount remote temperature sensors per HVAC duct plan. 6. Install supply temperature sensors 7. Install outdoor temperature sensor and photocell. 8. Install and connect CT’s per manufactures instructions. 9. Complete wiring between lighting control panel, thermostats and Control Box. 10.Mount User Interface panel as directed. 11. Mount communication hub and establish communications. 12. Perform EMS check out documentation. 13. Set permanent HVAC set points, HVAC schedules and lighting schedules. 14. Training restaurant operations on proper operations of EMS system. 15. If applicable, install temperature monitoring system (TMS) into appropriate refrigeration units. Electrical Contractor 1. Run and make final connection of high and low voltage wiring for equipment outside of EMS installers scope. 2. Run thermostat wiring for all RTU’s and remote sensors. 3. Install junction box above LP1 and run all load wiring for the following lighting circuits: kitchen, dining, building exterior lights, signs and lot poles. Emergency lights will not be controlled by EMS system. 4. Provide 1 e-phase 20amp breaker in Panel AP-4 (or see electrical schedule) to power control box. 5. Provide 1 single phase 20 amp breaker in LP1 to power EMS lighting control panel. 16. Verify eBoxx is communicating with Smart equipment. 17. Verify operations and configuration of all equipment.

4.27

Made with FlippingBook flipbook maker