New Restaurant Guide

EQUIPMENT INSTALLATION GUIDE

FINAL OPERATOR / INSTALLER MEETING

At the end of the installation, the operator or area supervisor is to meet with the installer for a final inventory and review. All items shorted, damaged, or inoperative must be noted on final inspection / installation report. Additional return visits after final installation inspection at the cost of the owner operator. KES Installer 1. Provide a complete list of equipment supplier’s addresses, telephone numbers, and names of people to contact if service or warranty work is required. 2. Provide a complete list of local sub-contractors, addresses, and telephone numbers; i.e., drink system, refrigeration installer, ice machine, Taylor, etc. Owner Operator 1. Fill out and complete all warranty papers and return them to the original manufacturer. Failure to do so can void the warranty. 2. Sign off installation completion report and release installer. 3. Should utilities not be available at completion of the installation and release of the installer it then becomes the responsibility of the owner operator or McOpCo to contact all the equipment start-up agencies.

4.28

Made with FlippingBook flipbook maker