GE Products BuyLog Smart Catalog

Uninterruptible Power Supplies Energy Connections SG Series 50-150 kVA Three-Phase Flywheel Systems Notes —DC Energy Storage Flywheels are typically used in lieu of Battery Plants, for short term backup time and green solution. If project requires DC Flywheel and Battery backup for same UPS Module, consult factory for application support and pricing. —External DC Cabling from the DC Flywheel to UPS Module is supplied and installed by others. Contractor to provide single, 250Amp 600VDC feeder from the UPS Module to the Battery System, unless noted otherwise. —In multiple DC Flywheel applications, it is not possible to tie all Flywheel cabling to one UPS Module bus landing area. The use of a DC Paralleling Cabinet is recommended. This DC Paralleling Cabinet will allow one feeder from the UPS Module to the Paral- leling Cabinet, and multiple feeders from the DC Paralleling Cab- inet to each Flywheel. All feeder cabling is supplied and installed by others. We recommend quoting the DC Paralleling Cabinet as an OPTION ADDER, as competitors may not quote this cabinet, thinking that the installing contractor will provide. —DC Flywheels are made in Cerritos, CA. DC Paralleling Cabinets are made in Carol Stream, IL. Leadtime ARO for both items is approx 5-7 weeks, and are drop-shipped to the jobsite.

Section 20

Backup Time Chart (in seconds)

Enhanced Flywheel SG UPS

Standard Flywheel SG UPS

UL SG 50

UL SG 80

UL SG 100 UL SG 120 UL SG 150

UL SG 50

UL SG 80

UL SG 100 UL SG 120 UL SG 150

kW

40

64

80

96

120

kW

40

64

80

96

120

No. of flywheels

No. of flywheels

1

1

142

88

71

59

45

94

58

46

38

30

2

2

174

139

115

91

115

92

76

60

3

3

Chart Notes: 1. Run times are rounded off to the nearest second and are based on UPS with 540Vdc float voltage. 2. DC-AC Efficiencies (battery to output) are based on battery power data at rated power factor from Technical Data Sheets. 3. Runtimes take into account the minimum 2 sec rectifier walk-in time.

Rev. 1/19 Data subject to change without notice

go.abb/industrial

GE Products BuyLog

20-39

Made with FlippingBook - Online magazine maker