ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

)

Dobrich

Zaječar

IBR

SARAJEVO

South Stream

Varna

SOUTH STREAM

Kozloduy

Oryahovo Pleven

KAVARNA

S E R B I A

Niš

GALATA

KALIAKRA

Dimitrovgrad 2.2.4 GREECE

SOFIA

M O N T E N E G R O

B U L G A R I A

P

Burgas

Pristina

U N M I K O S O V O

PODGORICA

ITB

IAP

124

Dupnitsa

Srtandszha Malkoclar

StaraZagora

52

Ihtiman

Zidilovo Kyustendil 50

TRA-N-063 PCI 6.9.1.

Stream

South

UGS-N-076 PCI 6.20.3. non-FID 2018

Kirklareli

Edirne

SKOPJE

TRA-N-188 PCI 6.11. FID 2014 Q2

non-FID 2016 Q2

Tekirdag TRA-N-128 PCI 7.1.2. PCI 7.4.1. non-FID 2019

Sakarya

Istanbul

IGB

Petrich

F Y R O M

Kulata

51 3

IAP

Xanthi

TIRANA

Sidirokastron

Kipi

Drama

Marmara Ereglisi

Komotini

ndisi

222 2 8

Kavala

Kilkis

5

6

Alexandroupoulis

Fiere offshore

Bursa

SanFoca

7

AegeanLNG AlexandroupoulisLNG GulfofSaros

TAP

Thessaloniki

TAP

Fier

Karacabey

TAP

Eskisehir

LNG-N-129 PCI 6.9.2.

G u l f o f S a r o s Çanakkale

A L B A N I A

Katerini TRA-N-014 PCI 7.1.4. non-FID – – –

1

Otranto

LNG-N-062 PCI 6.9.1.

Kutahya

Çan

non-FID 2016 Q1

Poseidon

IGI

Balikesir

non-FID 2016 Q2

Ezine

South Stream

Larissa

Afyonkarahisar

A e g e a n S e a

Volos

Thesprotia

Usak

EAST MED

Aliaga

Manisa

Lamia

Turgutlu

G R E E C E

Halkida

Izmir

Burdur

Aydin

Denizli

Thiva

EAST MED

ATHENS

308 4

Revithoussa

Mugla

MEGALOPOLI

I o n i a n S e a

LNG-F-147 FID 2016 Q1

C R E T A

Please refer also to the map on page 27

EAST MED

TRANS-MEDITERRANEAN GAS PIPELINE

NO.

PROJECT

CODE

STATUS

TSO / SPONSOR

COMMENTS

TSO PROJECTS 1 Komotini – Thesprotia pipeline

TRA-N-014 FID

This project was not considered in the network simulations of the present edition of the GRIP. DESFA has proposed to the NRA the deletion of this project from the 10 year Development Plan.

M e d i t e r r a n e a n S e a PCI 7.1.4.

2 Compressor Station at Kipi

TRA-N-128 non-FID PCI 7.1.2. PCI 7.4.1.

3 Bi-directional capacity at IP with BG

TRA-N-188 FID

PCI 6.11.

4 Revythoussa LNG 2 nd upgrade

LNG-F-147 FID

THIRD PARTY PROJECTS 5 Aegean LNG Import Terminal

LNG-N-129 non-FID PCI 6.9.2.

6 Underground Gas Storage at South Kavala

UGS-N-076 non-FID

The project promoter is to be selected through a tender procedure

PCI 6.20.3.

7 Alexandroupolis Independent

LNG-N-062 non-FID PCI 6.9.1. TRA-N-063 non-FID PCI 6.9.1.

Natural Gas System - LNG Section

8 Alexandroupolis Independent Nat- ural Gas System - Pipeline Section

18 |

Southern Corridor GRIP 2014–2023

Made with