ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
C. LNG ENTRY POINTS
Differently from the dynamics experienced at pipelines interconnection points, at LNG Entry Points gas flows are intrinsically more fluctuating, especially if the punctual, daily values are considered. More stable indications can be drawn from the analysis of monthly dynamics, which are in general showing a decrease in the usage of the regasification terminals, confirming the trend across Europe determined by the current LNG market condi- tions. Nevertheless, the role of LNG terminals both, on one hand, for security of supply and peak shaving needs and, on the other hand, for the exploitation of possible commer- cial opportunities cannot be denied or based on the study of a limited time window. In this paragraph the technical capacity is meant to be the regasification capacity of the terminal which may be different from that of the downstream pipeline infra- structure.
Panigaglia (GNL Italia > Snam Rete Gas)
GWh/d
GWh/d
IP Panigaglia (GNL Italia > Snam Rete Gas)
IP Panigaglia (GNL Italia > Snam Rete Gas)
140
140
120
120
100
100
80
80
60
60
40
40
20
20
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Technical Capacity
Average daily
Flow Range
Flow
Technical Capacity
Figure 4.26.1: Panigaglia: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.26.2: Panigaglia: Flows and booked capacity vs. technical capacity (daily)
Southern Corridor GRIP 2014–2023 |
69