ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

C. LNG ENTRY POINTS

Differently from the dynamics experienced at pipelines interconnection points, at LNG Entry Points gas flows are intrinsically more fluctuating, especially if the punctual, daily values are considered. More stable indications can be drawn from the analysis of monthly dynamics, which are in general showing a decrease in the usage of the regasification terminals, confirming the trend across Europe determined by the current LNG market condi- tions. Nevertheless, the role of LNG terminals both, on one hand, for security of supply and peak shaving needs and, on the other hand, for the exploitation of possible commer- cial opportunities cannot be denied or based on the study of a limited time window. In this paragraph the technical capacity is meant to be the regasification capacity of the terminal which may be different from that of the downstream pipeline infra- structure.

Panigaglia (GNL Italia > Snam Rete Gas)

GWh/d

GWh/d

IP Panigaglia (GNL Italia > Snam Rete Gas)

IP Panigaglia (GNL Italia > Snam Rete Gas)

140

140

120

120

100

100

80

80

60

60

40

40

20

20

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Technical Capacity

Average daily

Flow Range

Flow

Technical Capacity

Figure 4.26.1: Panigaglia: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.26.2: Panigaglia: Flows and booked capacity vs. technical capacity (daily)