Meeting #24

Description: no updates

Previous Meeting Minutes: 9/24/2019 - SWJV to send Spearhead information on additional access hatches required; SWJV to review Low Voltage devices within the trusses and coordinate with Spearhead; SWJV is now confirming the units on L3 will be loaded in through the west wall as opposed to south wall – SWJV to schedule install with Celtic ductwork 9/17/2019 - Celtic to move in frames to fit GFRC piece and install sheet metal enclosure – at this point may end up doing “mockup” on L4 in place 9/10/2019 - Celtic to move in frames to fit GFRC piece and install sheet metal enclosure 9/3/2019 - Celtic to move in frames to fit GFRC piece and install sheet metal enclosure; SWJV cut area in L4 wall for access on either side – need to review if can be used for additional storage 8/27/2019 - Celtic to move in frames to fit GFRC piece and install sheet metal enclosure; SWJV to review area enclosed behind L4 temp wall for additional storage; Spearhead to mount plywood to wall for L3 electrical closet 8/20/2019 - Celtic to move in frames to fit GFRC piece and install sheet metal enclosure; SWJV to review area enclosed behind L4 temp wall for additional storage See 8/13/2019 Meeting Minutes for Previous Notes

4

Made with FlippingBook Publishing Software