Final Combined Book v.4.0 test

Field Note

LGA - 620-027 — LGA CTB Replacement - PBB

When:

1/19, 6:43 pm

Text Wrapping up the elevator door bucks on level III. These door box or a problem due to the white tube steel that was proud of the rated wall. Extremely difficult to get scoreboard and set up for double layer. Zack Trausse directed Spearhead to bring the two layers of rock to it but the tube steel. Then we will fire caulk around it.

Made with FlippingBook Publishing Software