CHANGE ORDER
To: Spearhead Construction Subcontract/Purchase Order No.: 620-027 Change Order No.: 002
08/21/2019
Date:
Project:
1213126J-000 - LGAMASTER PROJECT
620.300.09200000.5020
Furnish and Install Gyp Board Walls and Partitions Level 1, 2 and 3
$350,439
CE # 05884D CE # 05884D CE # 05884D CE # 05884D
620.300.09200000.5020
$12,399
Furnish and Install Gyp Board at Escalator from Level 3 to 4 (Elevation 44'-4" to 73'-9" from BO' to BT.3 Line Furnish and Install Gyp Board Wall from Level 3 to 4 (Elveation 73'-9" to 112'-0" from B0 to BT.3 Line Furnish and Install drywall parition on interior face of exterior framing (framing by others) at chase walls in the flair area on Level 4 along BR, BA', BQ and BB Lines Furnish and Install fire blocking at wall type 0F06 full height at 10 feet o.c. maximum spacing along full length of wall furr out in the flair areas on Level 4 along BR, BA, BQ and BB Lines
620.300.09200000.5020
$10,215
620.300.09200000.5020
$40,658
620.300.09200000.5020
$0
CE # 05884D
620.300.09200000.5020
Doors Frames Hardware Level 1, 2, and 3 ( Receive & Install)
$6,756
CE # 05884D CE # 05884D CE # 05884D CE # 05884D
620.300.09200000.5020
All Accessories, FEC & Fire Extinguishers Level 1,2, and 3 (Receive & Install)
$589
620.300.09200000.5020
Fire Alarm Room per RFI -3133 and SK-0857
$12,587
620.300.09200000.5020
$0
Exhibit E, Section 4.2.1 is modified to allow twice monthly billings on or about the 15th and 30th of each month. Upon approval of estimate for payment by Contractor staff, Subcontractor will be paid 30 days from approval date.