Spring 2022 Hometown Messenger
PUBLIC WORKS
CONSTRUCTION CORNER Stay up-to-date on City of Shakopee construction projects CITY OF SHAKOPEE, MINNESOTA CONSTRUCTION PLANS FOR LIFT STATION REHABILITATION SANITARY SEWER LIFT STATION L16 SHEET INDEX SHEET NUMBER SHEET TITLE G001 COVER C101 GENERAL CIVIL CONSTRUCTION NOTES C102 EXISTING CONDITIONS C103 BYPASS SYSTEM PLAN AND PROFILE C104 AIR & VACUUM RELEASE STRUCTURE MODIFICATIONS C105 DIVERSION MANHOLE MODIFICATIONS C106 CIVIL DETAILS S001 STRUCTURAL NOTES S100 STRUCTURAL FRAMING PLANS P001 PROCESS GENERAL SHEET P101 DEMOLITION - PLAN VIEW P102 PROPOSED IMPROVEMENTS - PLAN VIEW
CTION LINE OPERTY BOUNDARY OPERTY LINE / LOT LINE SEMENT LINE
GHT-OF-WAY
RMANENT EASEMENT ONSTRUCTION EASEMENT
NITARY CLEANOUT NITARY SEWER NITARY MANHOLE
NITARY DROP MANHOLE
NITARY PIG NITARY WYE NITARY PLUG
REHABILITATION CITY PROJECT NO. SEWER-19-001
P301 P302 P303 P304 P701 P702 M001 M101 M102 M601 E001 E002 E003 E004 E101 E102 E103 E104 E105 E106 E107 E108 E109 E110 E111 E112 E113 E114 * E115 * E116 * E117 * E118 * E119 * E120 * E121
DEMOLITION - SECTION VIEWS DEMOLITION - SECTION VIEWS
EA INLET EHIVE INLET RB INLET ORM MANHOLE ORM DRAIN PIPE
PROPOSED IMPROVEMENTS - SECTION VIEWS PROPOSED IMPROVEMENTS - SECTION VIEW
LIFT STATION L16 DEMOLITION
LIFT STATION L16 PROPOSED IMPROVEMENTS MECHANICAL SYMBOLS AND ABBREVIATIONS
ATER LINE S OUTFALL
RB STOP
VALVE VAULT AND OPERATIONS LEVEL MECHANICAL DEMOLITION PLANS
ATER MANHOLE R RELEASE MANHOLE ETER MANHOLE
VALVE VAULT AND OPERATIONS LEVEL MECHANICAL PLANS MECHANICAL DETAILS AND EQUIPMENT SCHEDULES
ELECTRICAL SYMBOLS AND ABBREVIATIONS
TE VALVE
OW-OFF HYDRANT RE HYDRANT
SCADA NETWORK OVERVIEW LIFT STATION OVERALL SITE PLAN
ELL
WET WELL NO. 1 SECTION
R RELEASE HYDRANT
VALVE VAULT AND OPERATIONS LEVEL DEMOLITION PLAN
TTERFLY VALVE
ESSURE REDUCING MANHOLE IDE MANHOLE
OPERATIONS LEVEL PROCESS PLAN
VALVE VAULT AND OPERATIONS LEVEL LGPM PLAN
UG VALVE
L16 VARIOUS IMAGES L16 BACKPANEL DETAIL
ATER CROSS
ATER TEE
ATER FITTING ATER CAP ATER COUPLING ATER REDUCER
L16 CONTROL PANEL IO SCHEDULE
EXISTING SWITCHGEAR AND VFD ONE-LINE DIAGRAM
NEW SWITCHGEAR AND VFD ONE-LINE
PROJECT LOCATION 1249 BLUFF AVE. E
DDLE
VFD WIRING SCHEMATIC
BLE TV LINE
PANEL SCHEDULE
BLE TV PEDESTAL
VARIOUS SCHEDULES
LEPHONE LINE
STAGECOACH SCADA PROJECT
PUBLIC WORKS MASTER PLC
LEPHONE PEDESTAL
BER OPTIC LINE
PUBLIC WORKS SCADA MASTER PLC PANEL
BER OPTIC PEDESTAL
SCADA MASTER PLC CONTROL PANEL IO SCHEDULE
S LINE
ID129 LOCATION SITE PLAN ID129 CONTROL PANEL LAYOUT ID129 CONTROL PANEL IO SCHEDULE
S LINE VENT
ECTRIC, UNDERGROUND ECTRIC, OVERHEAD ECTRIC UTILITY POLE ECTRIC BOX ECTRIC MANHOLE ECTRIC GUY ECTRIC LIGHT ECTRIC SIGNAL ARM ECTRIC SIGNAL ECTRIC PUSH-TO-WALK
ID131
ID131 LOCATION SITE PLAN ID132 LOCATION SITE PLAN
ID129
ID131 AND ID132 CONTROL PANEL LAYOUT
ID129, ID131, AND ID132 CONTROL PANEL ONE-LINE DIAGRAM
ID132
E601 E602
VARIOUS SCHEMATICS
VARIOUS DETAILS
* THE COST FOR ALL WORK ASSOCIATED WITH SHEETS E115 - E121 SHALL BE BID AS THE "STAGE COACH FLOW MONITORING" LINE ITEM ON THE BID FORM.
KNOWN PEDESTAL KNOWN MANHOLE
THIS PLAN CONTAINS 49 SHEETS
DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR. DRAWINGS NOT IN COLOR WILL NOT ACCURATELY DISPLAY NECESSARY INFORMATION.
GEND
BUILDING
FENCE, CHAINLINK FENCE, WOOD FENCE, VINYL FENCE, BARBED WIRE FENCE, WOVEN WIRE
TREE - GROUP
TREE - DECIDUOUS SHRUB / BUSH SIGN
MILE POST BORE HOLE RIGHT-OF-WAY MONUMENT CONTOUR - INDEX CONTOUR - INTERMEDIATE
I HERBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
2022 PAVEMENT REHABILITATION PROJECTS The city intends to rehabilitate and reconstruct various streets and bituminous trails throughout the city, including a reconstruction of Gorman Street, Weston Court and Greenwood Court The city’s pavement preservation programmaintains existing infrastructure throughout the city this spring through fall of 2022 SEWER LIFT STATION I PROVEMENTS The city intends to rehabilitate its largest sewer lift station near Bluff Avenue and Marschall Road to provide additional redun dancy and emergency backup for one of our most critical assets Improvements include new pumps, grinders, valves, flow meters and SCADA control system An emergency bypass pumping sys temwill be used as backup, and the old lift station building will be demolished Construction is expected to begin in spring of 2022 with completion by fall SCOTT COUNTY DISTRICT COUNTY PROJECT LOCATION METRO GOVERNING SPECIFICATIONS THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION"STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN EXCEPT AS MODIFIED BY THE SPECIFICATIONS FOR THIS PROJECT. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MNMUTCD. INCLUDING "FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL C. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 28-2. ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA". NOTE: THE EXACT LOCATION OF UNDERGROUND UTILITIES SUCH AS GAS, TELEPHONE, FIBEROPTIC, ELECTRIC, CABLE TV, AND PIPE LINES ARE UNKNOWN. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL BEFORE COMMENCING EXCAVATION. GOPHER STATE ONE TICKET NO. XXXXXX. PLAN REVISIONS DATE SHEET NO. APPROVER
RIVER BLUFFS IMPROVEMENTS AND LEVEE DRIVE PARK TRAILHEAD The city plans to reconstruct Scott Street, Atwood Street and Levee Drive, including the extension of sanitary sewer and watermain, additional on-street parking, sidewalks, street lighting and a storm water treatment vault system This is happening in conjunctionwith the construction of a new apartment buildingwith restaurant space along the Minnesota River The DNR trailhead along the river will be reconstructed as part of this project, as well COUNTY ROAD 83 The citywill beworkingwithScott Countyon the reconstructionand expansion of County Road 83 fromHighway 169 to Valley Industrial Boulevard South The reconstruction project will include a new con crete roadway, bituminous trails, center median with landscaping and enhanced direction wayfinding and an overhead digital mes saging sign for Canterbury Event Traffic The goal of the project is to address existing operational and safety issues Construction will begin in spring of 2022 and proceed through the summer of 2023 LICENSE # 24388 SIGNATURE: 1-18-2022 9/03/21
STEVEN G. NELSON PRINT NAME:
BITUMINOUS PAVEMENT
DATE:
CONCRETE
GRAVEL
1
City awarded emerald ash borer mitigation grant
rotation, and 484 trees have been removed and replaced Nearly 900 untreated ash trees inventoried in city parks and rights-of-way still need to be removed and replaced
The City of Shakopee was recently awarded a $100,000 Emerald Ash Borer (EAB) grant from the Minnesota Department of Natural Resources (DNR) to remove and replace ash trees affected by EAB EAB is a destructive wood-boring pest The female EAB burrows into an ash tree and lays larvae that feed on the tree’s inner bark, eventually destroying the tree's capability to take in water and nutrients Origi nating in Asia, EAB was first detected in the United States in southeast Michigan in 2002 Today, EAB infestations have been found in 35 states EAB was confirmed in the City of Shakopee in January 2021 However, the city prepared for a possible EAB invasion by adopting an EAB plan in 2015 To date, 542 ash trees have been treated over a three-year
The DNR made $1 6 million in grant money available to municipalities to help prevent EAB from spreading further within their communi ties The $100,000 EAB grant will help fund removing and replacing infected ash trees, which pose significant public safety concerns
12 Hometown Messenger
Made with FlippingBook - professional solution for displaying marketing and sales documents online