2015SEPTOCT

www.fbinaa.org

S E P T 2 0 1 5 O C T

WHAT’S HAPPENING AT THE FBI NATIONAL ACADEMY? CAFETERIA/BOARD ROOM RENOVATION PROJECT

Armand T. Quattlebaum, PE Chief, Facilities Service Unit Quantico Operations Support Section

Lounge Area

Originally constructed in 1972; building 9 housed several diverse functions spread over 5 floors. The 1st floor consisted of an indoor gun range and gun cleaning area, gun vault and associated gun repair and machining spaces, and a student lounge. The 2nd floor consisted of the cafeteria and kitchen, Executive Dining Room, Credit Union, PX and limited office spaces. The upper and lower level basement consisted of classrooms and office spaces. The upper most floor was a penthouse and consisted of building mechani- cal and electrical infrastructure.

Boardroom Bar

Boardroom Dining

12

Made with FlippingBook Annual report