2015SEPTOCT

www.fbinaa.org

S E P T 2 0 1 5 O C T

The B9 renovation project was awarded via a Naval Fa- cilities Engineering Command (NAVFAC) contract to John C. Grimberg in September 2012 for $20.3M with an original contract completion date of April 2014. Due to several un- foreseen site conditions and associated time delays, cus- tomer requested changes and necessary infrastructure im- provements; the construction cost increased to $27M with a revised construction comple- tion date of July 2015. The scope of the project consisted of a full renova- tion of the cafeteria, kitchen, serving area, life health safety and ADA improvements (4 exterior staircases, new eleva- tor, Fire Alarm and Sprinkler upgrades), additional bath- rooms, new Lincoln Executive Dining Room, new Student Lounge area and a relocated PX and Credit Union to the first floor. Additionally, the proj- ect effected exterior masonry repairs, building infrastruc- ture replacements (plumbing, electrical switchgears and

General Dining-Boardroom

Justice Grill

Self-Serve Pasta Station

Lincoln Room

Main Dining

Stri Fry

Main Entree Line

Servery

continued on page 17

13

Made with FlippingBook Annual report