17 tips and tricks for happy IMRT planning
contouring
beam setup
start
optimisation
evaluate
setting
objectives
15
be critical towards objectives that
highly
contribute
to the total cost after the optimisation
it is likely that the overall result of your optimization predominantly
determined by these objectives
(for instance if you have a min dose objective to a structure in
the build-up region, a high cost might alarm you)