Table 5.4 Design Flows
Sewer System Master Plan
City of Morgan Hill
PRELIMINARY
Maximum Day
Peak Hour
(mgd)
(mgd)
2014 Existing Condition Scenarios
Existing DWF
2.8
5.4
Existing WWF (10Yr‐24Hr Design Storm)
3.7
7.7
Ultimate Buildout Scenarios
Buildout DWF
4.7
8.0
Buildout WWF (10Yr‐24Hr Design Storm)
6.0
10.5