Table 5.4   Design Flows

Sewer System Master Plan

City of Morgan Hill

PRELIMINARY

Maximum Day

Peak Hour

(mgd)

(mgd)

2014 Existing Condition Scenarios

Existing DWF

2.8

5.4

Existing WWF (10Yr‐24Hr Design Storm)

3.7

7.7

Ultimate Buildout Scenarios

Buildout DWF

4.7

8.0

Buildout WWF (10Yr‐24Hr Design Storm)

6.0

10.5