Previous Page  16 / 431 Next Page
Information
Show Menu
Previous Page 16 / 431 Next Page
Page Background

Table ES.1 Sewer System Performance and Design Criteria

Sewer System Master Plan

City of Morgan Hill

PRELIMINARY

Pipeline Criteria

Peak Dry Weather Flow Criteria

Maximum Allowable d/D

Existing Trunks

Proposed Trunks

0.90

0.75

0.90

0.75

Peak Wet Weather Flow Criteria

Hydraulic Grade Line (HGL) should be at least

3 feet

below the manhole rim

Pipe

Minimum

Size

Grade

(in)

(ft/ft)

(mgd)

(cfs)

8

0.0026

0.36

0.55

10

0.0019

0.56

0.87

12

0.0015

0.79

1.23

15

0.0011

1.28

1.98

18

0.0009

1.78

2.75

21

0.0007

2.43

3.76

24

0.0006

3.27

5.05

27

0.0005

4.18

6.47

30

0.0004

5.13

7.94

33

0.0004

6.04

9.34

36

0.0004

7.61

11.78

42

0.0003

10.27

15.90

1/7/2016

Capacity

(n = 0.013)

Diameter

(in)

8 to 12

> 12