City of Morgan Hill

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

12-0248 AEG CofMorganHill FM Rpt.docx

Page 11 of 46

Table 3. List of Flow Monitoring Sites

Metering

Site

Pipe

Diameter

(in)

Location

Site 1

18

Behind Residence Inn, off Madrone Pkwy.

Site 2

19.75

Butterfield Blvd., south of Jarvis Dr.

Site 3

15

Intersection of Main Ave. and Monterey Rd.

Site 4

12

E. Dunne Ave, just east of Butterfield Blvd.

Site 5

24

Intersection of Barrett Ave. and Railroad Ave.

Site 6

17.75

Intersection of Barrett Ave. and Railroad Ave.

Site 7

21

Intersection of Edes St. and Monterey Rd.

Site 8

17.5

W. Edmundson Ave., just west of Monterey Rd.

Site 9

15

Hale Ave., north of Wright Ave.

Site 10

11.75

Easement west of Monterey Rd., north of California Ave.

Table 4. Flow Monitoring Basin Information

Flow

Metering

Basin

Metering

Basin Size

(acres)

Basin Flow Calculation

Basin 1

817

Q

1(Basin)

= Q

1(Site)

Basin 2

910

Q

2(Basin)

= Q

2(Site)

– Q

1(Site)

Basin 3

345

Q

3(Basin)

= Q

3(Site)

– Q

9(Site)

Basin 4

823

Q

4(Basin)

= Q

4(Site)

Basin 5

807

Q

5(Basin)

= Q

5(Site)

– Q

2(Site)

– Q

3(Site)

– Q

4(Site)

Basin 6

1,918

Q

6(Basin)

= Q

6(Site)

Basin 7/8

765

Q

7/8(Basin)

= Q

7(Site)

+ Q

8(Site)

Basin 7

4

284

Q

7(Basin)

= Q

7(Site)

Basin 8

4

481

Q

8(Basin)

= Q

8(Site)

Basin 9

1,094

Q

9(Basin)

= Q

9(Site)

Basin 10

454

Q

10(Basin)

= Q

10(Site)

City of Morgan Hill

Collection System

9,500

Q

System

= Q

Harding

4

Basin 7 and 8 sizes in acres assume that cross-connections between the basins were not active during this flow monitoring

study. Report analyses assume non-active cross-connections and analysis results are shown for informational purposes only

and should be used per the discretion of the reader.