7 4 3 3 N . F I R S T S T R E E T , S U I T E 1 0 3 • F R E S N O , C A L I F O R N I A 9 3 7 2 0 • ( 5 5 9 ) 4 3 6 -
0 6 0 0 • F A X ( 5 5 9 ) 4 3 6 - 0 6 2 2
www.akeleng.comSmart Planning Our Water Resources
August 16, 2017
City of Morgan Hill
17575 Peak Avenue
Morgan Hill California, 95037
Attention: Karl Bjarke, P.E.
Director of Public Works/City Engineer
Subject: 2017 Sewer System Master Plan – Draft Report
Dear Karl:
We are pleased to submit the draft report for the City of Morgan Hill Sewer System Master
Plan. This master plan is a standalone document, though it was prepared as part of the
integrated infrastructure master plans for the water, sewer, and storm drainage master plans.
The master plan documents the following:
x
Existing collection system facilities, acceptable hydraulic performance criteria, and
projected wastewater flows consistent with the Urban Planning Area
x
Development and calibration of the City’s GIS
-based hydraulic sewer model.
x
Capacity evaluation of the existing sewer system with improvements to mitigate existing
deficiencies and to accommodate future growth.
x
Capital improvement program (CIP) with an opinion of probable construction costs and
suggestions for cost allocations to meet AB 1600.
x
Morgan Hill-Gilroy Joint Trunk Analysis/Evaluation
We extend our thanks to you, Dan Repp, Deputy Director of Public Works, and other City staff
whose courtesy and cooperation were valuable components in completing this study.
Sincerely,
AKEL ENGINEERING GROUP, INC.
Tony Akel, P.E.
Principal
Enclosure: Report