Previous Page  312 / 431 Next Page
Information
Show Menu
Previous Page 312 / 431 Next Page
Page Background

SITE 6

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

I/I Summary: Event 1

Baseline and Realtime Flows with Rainfall Data over Monitoring Period

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

02/25

02/26

02/27

02/28

03/01

03/02

03/03

03/04

03/05

03/06

03/07

03/08

03/09

03/10

03/11

03/12

03/13

03/14

03/15

03/16

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rainfall: 2.11 inches

Event 1

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

02/28

03/01

03/02

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Event 1 Detail Graph

Storm Event I/I Analysis (Rain = 2.11 inches)

0.91

Peak Flow:

PF:

mgd

2.60

Capacity

0.57

Peak I/I Rate:

mgd

Inflow / Infiltration

Total I/I:

gallons

136,000

12-0248 AEG Morgan Hill FM and II Rpt.doc

Page S6 - 7