Previous Page  343 / 431 Next Page
Information
Show Menu
Previous Page 343 / 431 Next Page
Page Background

SITE 8

Weekly Level, Velocity and Flow Hydrographs

3/10/2014 to 3/17/2014

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

0

2

4

6

8

10

12

14

16

18

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Level (in)

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

Velocity (fps)

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/10

3/11

3/12

3/13

3/14

3/15

3/16

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rain

Flow

BLFlow

Avg Level: 5.14 in. Peak Level: 6.65 in. Min Level: 3.77 in.

Avg Velocity: 0.57 fps Peak Velocity: 1.07 fps Min Velocity: 0.18 fps

Avg Flow: 0.158 mgd Peak Flow: 0.394 mgd Min Flow: 0.034 mgd

Page S8 - 10

12-0248 AEG Morgan Hill FM and II Rpt.doc