Previous Page  357 / 431 Next Page
Information
Show Menu
Previous Page 357 / 431 Next Page
Page Background

SITE 9

Weekly Level, Velocity and Flow Hydrographs

3/10/2014 to 3/17/2014

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

0

2

4

6

8

10

12

14

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Level (in)

Lev

0.0

0.5

1.0

1.5

2.0

2.5

Velocity (fps)

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

3/10

3/11

3/12

3/13

3/14

3/15

3/16

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rain

Flow

BLFlow

Avg Level: 3.92 in. Peak Level: 5.60 in. Min Level: 2.02 in.

Avg Velocity: 0.74 fps Peak Velocity: 1.15 fps Min Velocity: 0.21 fps

Avg Flow: 0.133 mgd Peak Flow: 0.309 mgd Min Flow: 0.015 mgd

Page S9 - 10

12-0248 AEG Morgan Hill FM and II Rpt.doc