SITE 9
Weekly Level, Velocity and Flow Hydrographs
3/10/2014 to 3/17/2014
City of Morgan Hill
Sanitary Sewer Flow Monitoring and I/I Study
0
2
4
6
8
10
12
14
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Level (in)
Lev
0.0
0.5
1.0
1.5
2.0
2.5
Velocity (fps)
Vel
0.00
0.10
0.20
0.30
0.40
0.50
0.60
3/10
3/11
3/12
3/13
3/14
3/15
3/16
Flow (mgd)
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Rain (in/hr)
Rain
Flow
BLFlow
Avg Level: 3.92 in. Peak Level: 5.60 in. Min Level: 2.02 in.
Avg Velocity: 0.74 fps Peak Velocity: 1.15 fps Min Velocity: 0.21 fps
Avg Flow: 0.133 mgd Peak Flow: 0.309 mgd Min Flow: 0.015 mgd
Page S9 - 10
12-0248 AEG Morgan Hill FM and II Rpt.doc