

6''
6''
6''
6''
6''
6''
6''
8''
6''
6''
6''
8''
6''
6''
8''
8''
6''
6''
6''
6''
6''
15''
8''
8''
6''
6''
6''
12''
6''
6''
12''
6''
6''
6''
6''
6''
MAIN
HALE
PEAK
MONTEREY
WRIGHT
CREST
5TH
DUNNE
DEPOT
2ND
CENTRAL
BUTTERFIELD
DE WITT
4TH
LLAGAS
SABINI
1ST
3RD
CHRISTEPH
EL TORO
CALLE MAZATAN
LONGVIEW
WARREN
ALKIRE
NOB HILL
NOBLE
LLAGAS CREEK
MCLAUGHLIN
LINDO
WAUGH
ENDERSON
KEYSTONE
HEIDI
BONNIE VIEW
DRIVEWAY
HILL
BRISCOE
1ST
Group 4
Sewer System
5
0
500
1,000
250
Feet
File Path: P:\xGIS\GIS_Projects\Morgan_Hill\Sewer\170217-SS Cond RiskAssessment\Rehab Costs\MH_Fig6-RehabCosts_Group4_061417.mxd
Sewer Condition Assessment
City of Morgan Hill
GIS
PRELIMINARY
Legend
Extreme Risk
High Risk
Moderate Risk
Open Cut Replacement
Trenchless Rehabilitation
Trenchless Replacement
Point Repair
Pipes
Roads
Updated: June 14, 2017
Open Cut Replacement
Trenchless Rehabilitation
Trenchless Replacement
Grand Total
Open Cut Replacement
Trenchless Rehabilitation
Trenchless Replacement
Grand Total
567 LF
8,714 LF
325 LF
10,299 LF
$1,533,400
$434,500
$375,380
$206,840
Point Repair
692 LF Point Repair
$198,120
2. Costs and lengths are preliminary and intended for basic planning purposes.
Improvements are subject to revision for both alignment, and rehab method based on more detailed review for design.
Notes:
1. Costs include master plan contingencies of 30% for unforeseen events and 30% for other costs including:
design, environmental, legal, construction management, and project administration.