Table of Contents Table of Contents
Previous Page  128-129 / 1143 Next Page
Information
Show Menu
Previous Page 128-129 / 1143 Next Page
Page Background

[IMC FS 2016]

28-Oct-16, Slide 16

Vacuum unit

Case study 1 - Valve specification

SIF action 2oo2 valves closed “Tight shut-off required” due to hot

gasses returning to scrubber

SRS decision, temperature gradient over distance meant leakage

permitted. TSO is a design requirement not a safety requirement.

Effect: SIL achievable, testing requirements, maintenance costs

Scrubber

Heater

Incinerator