Table of Contents Table of Contents
Previous Page  136-137 / 1143 Next Page
Information
Show Menu
Previous Page 136-137 / 1143 Next Page
Page Background

[IMC FS 2016]

28-Oct-16, Slide 20

Case study 3 – Tank overspill during unloading

Specification stated:

“on detection of high

high level close the

inlet valve”

SRS process of defining

the SIF concluded that

to cover all defined

initiating causes:

“on detection of high

high level close the

inlet valve and the

outlet valve”

(sometimes multiple)