Table of Contents Table of Contents
Previous Page  244-245 / 1143 Next Page
Information
Show Menu
Previous Page 244-245 / 1143 Next Page
Page Background

© SBM Offshore 2012. All rights reserved.

www.sbmoffshore.com

27

SIF too slow – other options

1. Review whether the optimum SIF is specified

2. Review/optimise the parameters used for the Process Safety time calculation

3. Redesign the process to make the hazard development slower

4. Redesign the process to eliminate the hazard

5. Prevent the hazard (reduce the risk) by mechanical locking of valves

6. Design an Inhibit SIF