Table of Contents Table of Contents
Previous Page  252-253 / 1143 Next Page
Information
Show Menu
Previous Page 252-253 / 1143 Next Page
Page Background

© SBM Offshore 2012. All rights reserved.

www.sbmoffshore.com

31

2. Process Safety Time – Optimise

Optimise?

• Reduce trip setpoint

• Relax allowed pressure rise (e.g. design pressure + 15%)

• Optimise modelling of pressure rise (e.g. including hold-up time of full

inventory instead of just vessel)

• Model SDV movement (as valve closes, it starts to restrict the flow)