03/11/2016

7

© Engineering Safety Consultants Limited

Page 13

Target Failure Measure of the SIF

Sensor

Final

Element

P E

Safety Instrumented Function (SIF)

The Proof Test is essential to maintain the Target

Failure Measure of the SIF…PFDavg

PFDavg

Risk

Target Risk

Risks arising

from dangerous

failures in the

process & in the

BPCS

Demands

F1

Risk reduction

achieved by

Other Risk

Reduction

Measures

F3

Risk reduction

achieved by

Conditional

Modifiers

F4

Risk Reduction

Risk Reduction

Risk Reduction

Risk Model Example: Low Demand Mode

F2

1

3

2

4

SILs

Proof Testing

maintains this

Risk Reduction