Table of Contents Table of Contents
Previous Page  461 / 1143 Next Page
Information
Show Menu
Previous Page 461 / 1143 Next Page
Page Background

03/11/2016

8

© Engineering Safety Consultants Limited

Page 15

1

2

3

4

>=10

-2

to <10

-1

>=10

-3

to <10

-2

>=10

-4

to <10

-3

>=10

-5

to <10

-4

Low demand mode

of operation

Average probability of

dangerous failure on demand

[PFDavg]

Safety

Integrity

Level

(SIL)

10,000 - 100,000

1000 - 10,000

100 - 1000

10 - 100

F2 / F1 = PFDavg

Frequency Reduction

Target Failure Measures: Low Demand Mode

F1 / F2 = Frequency Reduction

© Engineering Safety Consultants Limited

Page 16

Agenda

1. What is proof testing?

2. Overview of the requirements of IEC 61511

3. Proof test principles

4. Proof Test Procedures

5. Importance of Recording Proof Test Results

6. Concluding comments