Table of Contents Table of Contents
Previous Page  692-693 / 1143 Next Page
Information
Show Menu
Previous Page 692-693 / 1143 Next Page
Page Background

Unrestricted / © SiemensAG 2016. All Rights Reserved.

Integrated 1 and 2 Zone

Specifically designed and tested to operate in an

integrated mode.

Access protection is designed in.

Secure Data Writes from Operator station to SIS as

standard

Verification and Validation activities can span BPCS

and SIS

Single Window for the Operator

Common Asset Management tools

Use of Safety Lifecycle Tools facilitated.