Background Image
Previous Page  14 / 108 Next Page
Basic version Information
Show Menu
Previous Page 14 / 108 Next Page
Page Background

EuroWire – May 2012

12

News

Corporate

New Belden Railway Approved Gigabit

Ethernet data cable BE43800 offers

fast,

reliable

communications

and

enhanced system performance in railway,

transportation and city transit systems.

Belden

®

BE43800 is a halogen-free Cat

5e Ethernet cable that meets the highest

railway industry standards. This highly

specialised data cable reliably delivers

real time information for operators

and passengers, on-board as well as in

terminals and control rooms.

This new Belden

®

industrial Ethernet rail

cable is particularly suitable for use in

Gigabit Ethernet networks in rolling stock

onboard applications for monitoring,

recording

and

control

systems;

multimedia

passenger

information

and entertainment; and train control

management systems.

For safety and security, BE43800 Belden

cable is approved to international railway

standards.

Introducing the new cable, Louise

Wild, product manager, said: “This

Gigabit Ethernet data cable is highly

suited for use in the rail passenger

transport industry to support expanding

communications networks.

“Increasingly,

passengers

demand

improved comfort and safety on board

trains. They require actual travel-related

information such as arrival times,

connecting points and multimedia

services including Internet access and

infotainment. The shift to Gigabit Ethernet

facilitates all these and future services.”

Belden – Netherlands

Website

:

www.belden.com

Keeping the transport

system flowing

A

few

years

ago,

Tenova

LOI

Italimpianti

and

Tenova

Hypertherm

were

awarded

a

contract for two Roller Hearth

Furnaces for Tata Steel’s Thin Slab

Casting & Rolling plant (TSCR) in

Jamshedpur, India.

In December 2011 the dry-out was

carried out successfully and the hot

trial will start very shortly.

The second furnace, now in

advanced stage of erection, was

scheduled to be completed during

the first quarter of 2012.

Tenova – Italy

Website

:

www.tenovagroup.com

Furnaces up

and running