1 / 5 Next Page
Information
Show Menu
1 / 5 Next Page
Page Background

material & design specification:

A

B

C

D

E

F

G

existing canopy / ceiling

existing box section

existing storage units

existing skirting boards

existing reception rear wall - painted olive green

proposed new reception graphic:

° split-baton graphic with timber edging and halo-effect

° possible additional 3D Andor logo, colours & materials t.b.c.

A

B

E

C

D

F

G

proposed new reception counter graphic to be rear illuminated:

° material & design t.b.c.

front elevation

F proposed new reception graphic:

° split-baton graphic with timber edging and halo-effect

° possible additional 3D Andor logo, colours & materials

t.b.c.

G proposed new reception counter graphic to be rear

illuminated: ° material & design t.b.c.

client: Andor

title: Reception Counter - Opt1.

scale: 1:20 @ A3

project Manager: G.W

date: 17.02.16

designer: J.M.

venue: Andor - Belfast

drg no: DS693x17.02.16 001x17.02.16

This is a computer generated visual and may vary from actuality.

Estimates, designs, plans or models prepared by Minprint for the

information of the customer remain the property of

Minprint

and are copyright.

They must not in partor in whole be submitted to or copied or otherwise made

use of by any other without prior written permission from Minprint

.

c

Andor

Reception Area - Counter & Rear Wall / Opt1.