Previous Page  2 / 5 Next Page
Information
Show Menu
Previous Page 2 / 5 Next Page
Page Background

material & design specification:

A

B

C

D

E

F

existing canopy / ceiling

existing box section

existing storage units

existing skirting boards

A

B

E

C

D

F

G

front elevation

F proposed new reception graphic:

° split-baton graphic with timber edging and halo-effect

° prosed 3D wall panels to timber surface

° possible additional 3D Andor logo, colours & materials

t.b.c.

E proposed new 3D wall panels to rear reception wall

G proposed new reception counter graphic to be rear

illuminated: ° material & design t.b.c.

proposed new 3D wall panels to rear reception wall

proposed new reception graphic:

° split-baton graphic with timber edging and halo-effect

° prosed 3D wall panels to timber surface

° possible additional 3D Andor logo, colours & materials

t.b.c.

G proposed new reception counter graphic to be rear illuminated:

° material & design t.b.c.

client: Andor

title: Reception Counter - Opt2.

scale: 1:20 @ A3

project Manager: G.W

date: 17.02.16

designer: J.M.

venue: Andor - Belfast

drg no: DS693x17.02.16 002x17.02.16

This is a computer generated visual and may vary from actuality.

Estimates, designs, plans or models prepared by Minprint for the

information of the customer remain the property of

Minprint

and are copyright.

They must not in partor in whole be submitted to or copied or otherwise made

use of by any other without prior written permission from Minprint

.

c

Andor

Reception Area - Counter & Rear Wall / Opt2.