Background Image
Table of Contents Table of Contents
Previous Page  189 / 236 Next Page
Basic version Information
Show Menu
Previous Page 189 / 236 Next Page
Page Background

KHS Corpoplast GmbH

Meiendorfer Straße 203

22145 Hamburg

Deutschland

Tel: +49.40.67.907 0

info@khs.com

* Subject to technical modifications and price changes. On request, we will be glad to provide you with a binding offer.

Version 1 Date 31.04.2014

Description

The existing Taylor control will be replaced by electronic CO2 control unit of

identical installation dimensions. The control unit will be pre-configured and to

keep the commissioning time on site to a minimum.

The clear presentation of process parameters results in a significantly enhanced

ease of use. All settings can be logged in the PLC system as product-specific

parameters to allow for an automatic transfer to the control, when selection is

made.

Benefit

Availability of spare parts ensures production reliability

Uniform product quality, as product parameters logged in the control

system and accessible at any time

Increased ease of use, as necessary corrections are entered and immediately

processed during production

Optionally: Connection to PMS (plant monitoring system)

Scope of supply

Siemens Simatic S7 components

CO2 pressure control valve

Measuring systems

(pressure/temperature sensors)

Software extension

KHS Service O&H circuit diagram

update

Contact

Siegfried.Buchhol z@KHS.com

Conversions time / Delivery time

Duration for on-site installation and

commissioning: 2-3 days

KHS Innopro

O+H INTERMIX ELECTRONIC CO2 CONTROL

EN

KHS Innopro

TECHNICAL UPGRADE

Suitability

INTERMIX EID Mixer

KASKADE Mixer