At the beginning of a cleaning cycle, the water dosing tank (B3) is filled to the

point of overflowing. Subsequently, the cleaning agent enters the pressure

compensation pipe between the tank (B3) and the storing tank (B5).

Through the inclusion of spray nozzles in the compensation pipe and an

appropriate software modification, the time-consuming overflow of the tank B3

may be entirely omitted. In addition, the idle time needed for the tank's discharge

decreases significantly. This upgrade facilitates a nearly continuous flow of the

cleaning agent.

Benefit

Increase in productivity

due to the reduced cleaning cycle (up to 10% added

production time)

Reduction of consumption data

Scope of supply

Injection grouting lance

Spray nozzles

Spray nozzle pipes

Beverage pipe

Threaded connection

Fitting materia

Software update

Contact

Siegfried.Buchhol z@KHS.com

Conversions time / Delivery time

Duration for on-site installation and

commissioning: 2-3 days