KHS Corpoplast GmbH
Meiendorfer Straße 203
22145 Hamburg
Deutschland
Tel: +49.40.67.907 0
info@khs.com* Subject to technical modifications and price changes. On request, we will be glad to provide you with a binding offer.
Version 1 Date 31.04.2014
Description
At the beginning of a cleaning cycle, the water dosing tank (B3) is filled to the
point of overflowing. Subsequently, the cleaning agent enters the pressure
compensation pipe between the tank (B3) and the storing tank (B5).
Through the inclusion of spray nozzles in the compensation pipe and an
appropriate software modification, the time-consuming overflow of the tank B3
may be entirely omitted. In addition, the idle time needed for the tank's discharge
decreases significantly. This upgrade facilitates a nearly continuous flow of the
cleaning agent.
Benefit
Increase in productivity
due to the reduced cleaning cycle (up to 10% added
production time)
Reduction of consumption data
Scope of supply
Injection grouting lance
Spray nozzles
Spray nozzle pipes
Beverage pipe
Threaded connection
Fitting materia
Software update
Contact
Siegfried.Buchhol z@KHS.comConversions time / Delivery time
Duration for on-site installation and
commissioning: 2-3 days
KHS Innopro
O+H INTERMIX OPTIMIZATION CLEANING
CYCLE
EN
KHS Innopro
TECHNICAL UPGRADE
Suitability
INTERMIX C mixer
Basic requirement:
O+H PLC Upgrade Simatic S7