The UK Offshore Oil and Gas Fabricators Directory 2015 - page 64

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2015
page 64
Capabilities and Capacities – Facility 2, Ship Repair
Total Area (m²)
81,000 m
2
Fabrication Area Covered (m²)
1,200 m
2
Assembly and Erection Area (m²)
25,000 m
2
Cranage – Lifting Capacity and Hook
Height (Tonnes and Metres)
Workshop
• 25 tonne Gantry Crane
Dry Dock
• 1 x 80 tonne at 38 metre Tower Crane
• 1 x 40 tonne at 25 metre Tower Crane
• 1 x 40 tonne at 25 metre Tower Crane
Quayside
• 1 x 40 tonne at 30 metre Tower Crane
Load-Out Capacity (Tonnes)
• Up to 30,000 tonnes via skidding on quayside
• Multi-wheel transporters capable of handling up to
780 tonnes. Additional transporters hired as necessary
Minimum Water Depth (Metres)
8.6 metres
Maximum Water Depth (Metres)
11.6 metres
Dry-Dock Capability
• 335 metres x 50 metres x 14.75 metres (Belfast Dock)
• 333 tonnes/metre or 10.94 tonnes/m
2
load capacity
Other e.g. Licences, Permissions,
Warehouse and Storage Size,
Engineering, Electrical and Joiners
Workshop Size, etc.
• Quay facilities – 432 metres
• Access is via the Victoria Channel:
- Minimum water depth 7.8 metres CD
- Width = 152.4 metres
- No height restrictions on route to open water
• Licensed for slops reception (1,500 tonnes)
• Licensed for open grit blasting
• ISPS accredited
• Design engineering departement in-house
• Structure decommissioning
• FPAL Verified
N.B: Both yards are 0.5 miles apart and are connected by
a harbour authority road. Therefore, all workshops and
services within each are shared and can be used regardless
of where the project is located.
>
1...,54,55,56,57,58,59,60,61,62,63 65,66,67,68,69,70,71,72,73,74,...114
Powered by FlippingBook