Projects and Markets
Fabrication Tonnage
(Last Three Years)
Circa 15,500 tonnes
Fabrication Revenue/Turnover
(Last Three Years)
2011 – £24,608,000
2012 – £42,162,000
2013 – £32,023,000
Ability To Build Large Structures
Under Cover (Yes/No)
• Yes – the 30,000 m
2
fabrication halls have vast capacity with
doors 40 metres wide by 18 metres tall, meaning that most
oil and gas and marine structures can be completed and
outfitted under cover.
• In addition, there are four painting and blasting cells located
alongside the main building dock. The largest of which is
70 metres x 30 metres x 19 metres (apex height) served by
the Gantry Crane. The roof is removable to allow products
to be placed in position and the height to be increased.
>