Projects and Markets
(continued)
Buzzard Platform
Client:
Nexen Petroleum UK Ltd
Contract:
Fabrication Contract (topside and bridges)
Completion Date:
2010
Structure:
Production sweetening topsides and
bridge
(Heerema Hartlepool)
Weight
Topside:
6,000 tonnes
Bridge:
500 tonnes
Size (Length x Width x Height)
Topside:
60 x 36 x 42 metres
Bridge:
50 metres
Sheringham Shoal Substation Topsides
Client:
AREVA T&D Ltd
Contract:
EPC
Completion Date:
2010
Structure:
Two offshore wind substation topsides
Weight
Topsides:
806 tonnes and 803 tonnes
Size (Length x Width x Height)
Topside:
30.5 x 17.7 x 16 metres
>