The UK Offshore Oil and Gas Fabricators Directory 2015 - page 77

page 77
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2015
Projects and Markets
(continued)
Greater Gabbard Topsides
Client:
Siemens Energy
Contract:
EPC
Completion Date:
2009
Structure:
Offshore wind substation topside
Weight
Topside:
2,100 tonnes
Size (Length x Width x Height)
Topside:
39 x 31 x 18 metres
>
1...,67,68,69,70,71,72,73,74,75,76 78,79,80,81,82,83,84,85,86,87,...114
Powered by FlippingBook