The UK Offshore Oil and Gas Fabricators Directory 2015 - page 83

page 83
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2015
Projects and Markets
Prior Experience/Projects
Nexen Buzzard Additional Living Quarter
Design, engineering and construction of a 60-man additional living
quarter (ALQ). It was constructed as 18 separate modules fully
commissioned and installed offshore to reduce the need for
heavy lifting barges
Talisman Montrose Additional Living Quarter
Design, engineering and construction of a 30-man ALQ, constructed as
16 mini modules each weighing a maximum of 200 tonnes to meet the
lifting capacity of the platform’s crane
Stena Spey Additional Living Quarter
Design, engineering and construction of an eight-man ALQ, helishack
and helideck
Everest Additional Living Quarter
Design, engineering and construction of a 24-man ALQ. The project was
completed from design to installation within 12 months
Expertise
Hertel specialises in the design, engineering and construction of offshore
living quarters (LQs) and ALQs which can be constructed as a series of
modules or one complete monolithic structure.
Fabrication Tonnage
(Last Three Years)
Not provided
Fabrication Revenue/
Turnover
(Last Three Years)
Not provided
Ability to Build Large
Structures Under Cover
(Yes/No)
Yes
Current Market Areas
Current operations centre on the UK Continental Shelf
Potential Market Areas
Areas of expansion include Norway, however, work can be carried out
worldwide
Other Information
Hertel is an accredited company with over 40 years’ experience of
providing offshore structures. All of its construction and outfitting works
can be carried out undercover safe from the elements, reducing the risk
of disrupting the schedule.