The UK Offshore Oil and Gas Fabricators Directory 2015 - page 75

page 75
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2015
Projects and Markets
(continued)
Andrew Process Platform
Client:
BP Exploration Operating Co. Ltd
Contract:
Fabrication
Completion
Date:
2012
Structure:
Wellhead platform and jacket
Weight
Topside:
750 tonnes
Size (Length x Width x Height)
Topside:
18 x 13 x 28 metres
Ensign Platform
Client:
Centrica Energy
Contract:
Engineering, procurement and construction
(EPC)
Completion
Date:
2011
Structure:
Wellhead platform and jacket
Weight
Topside:
500 tonnes
Jacket:
500 tonnes
Size
(Length x Width x Height)
Topside:
16 x 12 x 8.5 metres
Jacket:
20 x 20 x 48 metres
>
1...,65,66,67,68,69,70,71,72,73,74 76,77,78,79,80,81,82,83,84,85,...114
Powered by FlippingBook