Simon Storage - ISCo East
No.7 Switchroom – MCC Power Supply Installation Tender
P & I Design Ltd
DOCUMENT NO: SI451002_INS
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: B DATE: 25.02.13
Tel: + 44 (0)1642 617444
PAGE 7 OF 12
Fax: + 44 (0)1642 616447
www.pidesign.co.uk4
SCOPE OF WORK
The scope of work is as detailed in the following sections and as shown on the
documentation listed below.
Cable Schedule
SI451002_SCH Rev B
4.1
Switchroom Containment
Switchroom containment was installed under a previous scope of work (SI451001_INS),
therefore only small local containment should be necessary under this scope, if at all.
4.2
Switchroom Cabling
4.2.1
MCC 1 Supply
Install cabling from LV board section C3 to MCC1
4.2.2
MCC 2 Supply
Install cabling from LV board section C4 to MCC2
4.2.3
Crash Stop (MCC 1)
Install cabling from Local Crash Stop Node to MCC 1
4.2.4
Crash Stop (MCC 2)
Install cabling from Local Crash Stop Node to MCC 2
4.3
Contractor Supplied Equipment
None
4.4
Free Issue Equipment
None