Simon Storage - ISCo East

No.7 Switchroom – MCC Power Supply Installation Tender

P & I Design Ltd

DOCUMENT NO: SI451002_INS

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 25.02.13

Tel: + 44 (0)1642 617444

PAGE 7 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4

SCOPE OF WORK

The scope of work is as detailed in the following sections and as shown on the

documentation listed below.

Cable Schedule

SI451002_SCH Rev B

4.1

Switchroom Containment

Switchroom containment was installed under a previous scope of work (SI451001_INS),

therefore only small local containment should be necessary under this scope, if at all.

4.2

Switchroom Cabling

4.2.1

MCC 1 Supply

Install cabling from LV board section C3 to MCC1

4.2.2

MCC 2 Supply

Install cabling from LV board section C4 to MCC2

4.2.3

Crash Stop (MCC 1)

Install cabling from Local Crash Stop Node to MCC 1

4.2.4

Crash Stop (MCC 2)

Install cabling from Local Crash Stop Node to MCC 2

4.3

Contractor Supplied Equipment

None

4.4

Free Issue Equipment

None