Simon Storage - ISCo East
No.7 Switchroom – Existing Board (EE) Transition to new MCC(s)
P & I Design Ltd
DOCUMENT NO: SI451004_INS
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 22.02.13
Tel: + 44 (0)1642 617444
PAGE 8 OF 15
Fax: + 44 (0)1642 616447
www.pidesign.co.uk4.4
Cabling (Ex Board EE)
The following drives are to be relocated to the new MCC 1
P3-10
P3-11
P3-13
P3-16
P3-36
C3-31
4.4.1
P3-10
Existing ISCo Drg. Ref.
SPW-95-216 Rev. 1
New P&I Design Drg. Ref.
SI451062_DWG Rev A
Control cabling as listed below to be pulled back from existing board and
terminated to MCC 1 as shown on P&I Drg.
C30079
C30080
Jetty Stop interface cabling as listed below to either be pulled back from existing
panel if long enough or replaced with new
C30078
Drive cable to be replaced as shown on cable schedule.
4.4.2
P3-11
Existing ISCo Drg. Ref.
SPW-98-415
New P&I Design Drg. Ref.
SI451063_DWG Rev A
Control cabling as listed below to be pulled back from existing board and
terminated to MCC 1 as shown on P&I Drg.
C30909
Jetty Stop interface cabling as listed below to either be pulled back from existing
panel if long enough or replaced with new
C30939
Drive cable to be replaced as shown on cable schedule.