Simon Storage - ISCo East
No.3 Pumphouse Modifications – Electrical Infrastructure Installation Tender
P & I Design Ltd
DOCUMENT NO: SI451001_INS
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 15.02.12
Tel: + 44 (0)1642 617444
PAGE 7 OF 14
Fax: + 44 (0)1642 616447
www.pidesign.co.uk4
SCOPE OF WORK
The scope of work is as detailed in the following sections and as shown on the
documentation listed below.
Cable Schedule
SI451001_SCH Rev A
Basis of Design Document
SI451001_RPT Rev B
4.1
Switchroom Containment
Referring to switchroom layout sketch in ‘Basis of Design document SI451001_RPT,
already issued (sketch repeated below). Extensive cable racking is to be provided to
provide the infrastructure for this scope and the future final switchroom layout. Some
racking is currently being installed under a separate contract by Aquabio and new racking
will have to tie into this as far as possible.
a.
2 off 900mm ladder racks vertically stacked one for power and one for control,
extending wall to wall across the newly constructed southern switchroom wall
between expected external cable entry positions. This racking is to pass over the top
of the LV board. Power rack to be above control rack.
b.
2 off 900mm ladder racks side by side for power cables extending from the power
rack in (a) above, across the top of MCC 1 & 2 throughout the length of the
switchroom to cater for future extension of the MCCs.
c.
2 off 900mm ladder racks side by side for control cables extending from the control
rack in (a) above, across the top of MCC 1 & 2 marshalling section and terminating
prior to the start of the main MCC. These shall be positioned beneath the power
racks.
d.
2 off 600mm ladder racks vertically stacked, one for power and one for control,
extending from the 900mm racks in (a) above around the eastern side wall of the
switchroom to provide for cables to future control panels positioned against the
switchroom wall.
e.
2 off 600mm ladder racks vertically stacked, one for power and one for control,
extending from the 900mm racks in (a) above, around the western side of the
switchroom to provide for cables to future panels. These racks are to be aligned with
the Aquabio panel which stands away from the side wall. The racks are to terminate
at the Aquabio panel but will need to carry the main power cable from the LV board
to the Aquabio panel main incomer.